The day arrived. Starting this Tuesday, June 4, you will be able to use the Aztecas Avenue Trolleybus. This line has an extension of 7.3 kilometers and will run from Perisur to Tasqueña. We tell you which stations it has, the schedule in which it will operate and all the details of this new line.
In a press conference, it was detailed that Line 12 of the Trolleybus will operate from Monday to Saturday from 05:00 to 00:00 and on Sundays from 05:30 to 23:30. It is worth mentioning that the only way to access this means of transportation is by using the Integrated Mobility Card. So don’t forget it before leaving home.
This is the Aztecas Trolleybus
In total, this new Mexico City Trolleybus line has 19 stations:
- Tasqueña
- Cerro Huitzilac
- Central
- División del Norte
- Los Pinos
- Circunvalación
- Pacífico
- Eje 10
- Cantil
- Moctezuma
- Topiltzin
- Ixtlixochitl
- Tepalcatzin
- Moctecuzoma
- Papatzin
- Cantera
- Tita Avendaño
- Céfiro
Travel time is estimated to be approximately 30 minutes. This line will operate with 28 electric units and is expected to transport close to 30 thousand users per day.
Trucks belonging to routes 1 and 13 will no longer provide service in the Zone. It will have connections with other means of transportation including the Light Rail, Metro Line 1, Metrobus Line 1 and Trolleybus Lines 1 and 7.